Workstation

A Workstation stores information regarding the place where the workstation operations are carried out.

Data regarding the operation cost, rent, electricity can be stored here.

To access the Workstation list, go to: Home > Manufacturing > Bill of Materials > Workstation

1. How to create a Workstation

  1. Go to the Workstation list, click on New.
  2. Enter a name for the Workstation.
  3. Under Operating Costs, enter the following as applicable:
    • Electricity Cost
    • Rent Cost
    • Consumable Cost
    • Wages
  4. Save.

Optionally, you can enter a description for the Workstation.

The hours when the Workstation will be Operational can be added. On adding a Holiday list, the days listed as holidays won’t be counted as working for the Workstation. 

After saving the Workstation, the following actions can be performed against it: 

2. Features

2.1 Production Capacity

Production Capacity is the total number of jobs can be executed at the same time in the respective workstation.

2.2 Working Hours

Under Working Hours table, you can add start and end times for a Workstation. For example, a Workstation may be active from 9 am to 1 pm, then 2 pm to 5 pm. You can also specify the working hours based on shifts. While scheduling a Work Order, the system will check for the availability of the Workstation based on the working hours specified.

2.3 Holiday List

  1. A Holiday List can be added to exclude counting these days for the Workstation.